
Jobs the desk attends, buildings we survey, and the rooms after the water is stopped. London first.
On the job

London
Burst waste
Trap split under the basin. Water on the floor until the joint is remade.

London
Ceiling made good
Plaster down, joists open. Boarded, skimmed, the downlight put back.

London
Mould corner
Bloom at the window reveal. Wall washed, sealed and painted back.

London
Shower drain
Standing water cleared. Trap cleaned, grate put back, floor left dry.

London
Door handle
Snapped lever off. New satin set fitted to the existing rose.

London
Sash replaced
Glass out, frame rotten. New unit, sill made good.

London
Galley kitchen
Tired units out. Oak, brass, the same window, the same cooker run.

London
The drawing room
Empty, then joinery, then the sofa. Fireplace kept. Floor laid.

London
The bay
Olive walls, brass chandelier, the bay kept. Plan first, paint second.

London
The kitchen as found
First visit. The room before the spec.

London
The shop
Fit-out on a trading street.

London
Reception
The desk the building is run from.

London
Commercial WC
Common parts brought back to a standard the occupier can use.

London
The slab
Industrial floor. The building as a working asset.

London
Brick and sash
Elevation as found. Repair, not a new face.

London
Rear elevation
The back of the house. Pointing and openings kept.

London
Vacant flat
Empty, ready for the spec.

London
The facade
Bay, stucco, the street front.
Commercial

City of London
Office floor before fit-out

London
Plant room

London
Residential lobby

London
Fire door

London
Strip-out and survey

London
Period sitting room

London
Terrace under scaffold

London
Stucco terrace at night

Westminster
The river at dusk

London
Crescent at dusk
Active leak or no heat: call 020 4571 4235. The form does not dispatch.
Enquire